Difference between revisions of "FINIX PB2 example input"
(Created page with "The input model is based on the Peach Bottom 2 BWR assembly from the UAM benchmark <ref>Ivanov et al. "''BENCHMARKS FOR UNCERTAINTY ANALYSIS IN MODELLING (UAM) FOR THE DESIGN,...") |
|||
Line 1: | Line 1: | ||
The input model is based on the Peach Bottom 2 BWR assembly from the UAM benchmark | The input model is based on the Peach Bottom 2 BWR assembly from the UAM benchmark | ||
− | <ref>Ivanov et al. "''BENCHMARKS FOR UNCERTAINTY ANALYSIS IN MODELLING (UAM) FOR THE DESIGN, OPERATION AND SAFETY ANALYSIS OF LWRs, Volume I: Specification and Support Data for Neutronics Cases (Phase I), Version 2.1''", NEA/NSC/DOC(2013)7</ref> | + | <ref>Ivanov et al. "''BENCHMARKS FOR UNCERTAINTY ANALYSIS IN MODELLING (UAM) FOR THE DESIGN, OPERATION AND SAFETY ANALYSIS OF LWRs, Volume I: Specification and Support Data for Neutronics Cases (Phase I), Version 2.1''", NEA/NSC/DOC(2013)7</ref> with the segmented absorber rod replaced by a full length one. |
− | with the segmented absorber rod replaced by a full length one. | + | |
+ | == Main Serpent input == | ||
+ | |||
+ | </references> |
Revision as of 14:07, 1 December 2015
The input model is based on the Peach Bottom 2 BWR assembly from the UAM benchmark [1] with the segmented absorber rod replaced by a full length one.
Main Serpent input
</references>- ^ Ivanov et al. "BENCHMARKS FOR UNCERTAINTY ANALYSIS IN MODELLING (UAM) FOR THE DESIGN, OPERATION AND SAFETY ANALYSIS OF LWRs, Volume I: Specification and Support Data for Neutronics Cases (Phase I), Version 2.1", NEA/NSC/DOC(2013)7